You need paper bags, paper cups or colour boxes to arrive before February 15. Your artwork is not final yet. Is there still time?
Maybe. It depends on the date the packaging has to arrive, and whether the text, design and structure are confirmed. If you count backwards from that date, you will know quickly — and you will not lose a week finding out.
Start from the date the packaging has to arrive
Do not start from today. Start from the day the packaging must be in your hands: before February 15.
For Chinese suppliers, that means the goods must ship before February 1, before the Lunar New Year holiday. The holiday falls in early February — in 2027, Lunar New Year's Day is February 6 — and factories close for it. So February 1 is not just a shipping date. It is the last date production can finish before the holiday.
Then work backwards from February 1, and leave time for each step, in this order:
- Design and artwork finalisation — usually 1–2 days — confirming the text, logo, colours, finish, size, structure and material, and making the flat artwork to fit that structure.
- Sampling and sign-off — making the sample, checking it, and confirming it in writing.
- Mass production — after the sample is confirmed.
- Shipping — from our factory to you, by the shipping method you choose.
If any one of those blocks has no time left in it, the date does not work. That is why “can we make February 15?” has no fixed answer. Tell us your arrival date and your specs, and we will check them against our actual production schedule and give you a real yes or no. We do not guess that.
What February 1 means in practice
Use the production times below, and count back from February 1:
- Paper bags usually take 10–12 days in production. To ship by February 1, production needs to start around January 20–22. Design and sampling have to happen before that.
- Paper cups usually take about 8–10 days in production. To ship by February 1, production needs to start around January 22–24. Design and sampling have to happen before that.
- Paper boxes usually take 10–15 days in production. To ship by February 1, production needs to start around January 17–22. Design and sampling have to happen before that.
Design usually takes 1–2 days, so add that in too. Those production times are after the sample is confirmed. Design, sampling, sign-off and delivery are on top of them, so add them in when you count backwards. If production would have to start during the holiday, it cannot — it has to finish before February 1.
Shipping: air is fast, sea is cheaper
Shipping time depends on the method you choose, and it counts towards February 15 just as much as production does.
Air freight is faster, but it costs more. Sea freight costs less, but it takes longer. There is no right choice for everyone — it depends on how much time is left after production, and what the order is worth to you. Decide the shipping method early, not after production is finished, because it decides whether the February 1 ship date still gets the goods to you by February 15.
Finalising the artwork is not just making it look good
A lot of orders slow down here. The design looks fine on screen, but the size, structure or material is not settled yet. Then someone changes one line of text, or one dimension, and the die-cut and the finish have to change with it.
So before we make the artwork final, we confirm these together: the text, the logo, the colours and the finish — with the size, the structure and the material you want. They have to match before sampling and production, not after.
Change the text, the design or a structural size once, and the die-cut and the finish often have to change too. Confirm them once, properly, and the rest moves much faster.
How we work: design and production under one roof
We do the design and the production under one roof, end to end. You do not have to take a design from one place to a factory in another and explain it all over again.
Here is the order that works best:
First, we check the size and the use of the packaging, and the logo, text and position that must be printed — including which way up it should read. Once those are aligned, we make the proposal, and the flat artwork is made to fit that structure.
Then we can make a sample. Check the material, the structure, the printing and the surface finish on the sample itself — not just in a photo. Once you are happy, confirm it in writing, and then we go into mass production. How long sampling takes depends on the kind of sample.
How long does production take?
After the sample is confirmed, as a guide:
- Paper bags: usually 10–12 days.
- Paper cups: usually about 8–10 days.
- Paper boxes: usually 10–15 days.
All three depend on the specs. That time is for production only. Design (usually 1–2 days), sampling, sign-off and delivery are extra, so add them in when you count backwards.
Minimum order
Minimum orders are different for each product:
- Paper cups: from 1,000 pcs.
- Shopping paper bags: from 200 pcs.
- Paper boxes: from 500 pcs.
If your artwork is not finished yet, you can still start
You do not need a finished file to talk to us. If the artwork is not done, we can take it from design through to production.
Send us what you have: the size you need, what the packaging is for, your logo and text, and the date it has to arrive. We will tell you what is confirmed, what is still missing, and whether February 15 is still possible — before you spend time finishing artwork that may need to change anyway.
FAQ
Can I still make February 15 if my artwork is not final?
It depends on your arrival date and whether the size, structure and material are confirmed. Send us what you have and the date you need it by — we will check it against the production schedule and tell you.
Why must the goods ship before February 1?
Because Chinese factories close for the Lunar New Year holiday in early February. To arrive before February 15, the goods must leave before the holiday, so production has to finish before February 1.
How long does design take?
Usually 1–2 days. Add that to sampling, production and shipping when you count backwards.
How long does production take after the sample is confirmed?
Paper bags usually take 10–12 days. Paper cups usually take about 8–10 days. Paper boxes usually take 10–15 days. All three depend on the specs, and design, sampling, sign-off and delivery are extra.
Should I choose air or sea freight?
Air is faster but costs more. Sea costs less but takes longer. It depends on how much time is left after production. Decide early, because the shipping method decides whether a February 1 ship date still arrives by February 15.
What are the minimum orders?
Paper cups from 1,000 pcs, shopping paper bags from 200 pcs, and paper boxes from 500 pcs.
What should I confirm before sampling?
The size and use, the material, and the logo, text, colours and finish — including the print position and direction. Confirm those first, then sample. A change after sampling usually means a new sample.
Can you do the design as well as the production?
Yes. We do design and production under one roof, end to end, from the first draft through to the finished order.